Long Island’s latest skate park – 110 Skate Park is set to open mid January and just posted park layouts designed by Team Pain. Space looks huge and has a nice mix of street & tranny with some breathing room. They even included a seperate beginners area! Check some more layouts and specs below:

 

Park features include:

  • Multi-depth bowl with 2 hips (from 5’6″ to 7′ deep)
  • Roll-in / Bank
  • 7 stairs with handrails and hubbas
  • Bump to ledge
  • ¼ pipe with bowl corner and extension
  • Flat ledge
  • Mellow hubba / up ledge
  • Tranny hip
  • Tight & low ¼ pipe w/bowl corner
  • Jump pike
  • 4 stair with hubba and handrail
  • 2 stair with flat rail
  • Gap to hubba
  • Granite many pad
  • Euro gap
  • Step-up ledge
  • Hip pike
  • ¼ pipe with extension
  • Escalator
  • China bank
  • Roof gap with ledge
  • Bump to down rail
  • Loading dock / kicker pike
  • Separate beginners area
  • Fenced in spectators area for the bowl

(info via the 110 Skate Park Facebook page)